| When refitting
a trailers' road wheels it is ESSENTIAL that the wheel nuts/bolts are
tightened to the recommended torque figure and in the correct sequence.
To neglect this is too run the risk of either the nuts/bolts working loose
and the wheel coming off (not tight enough), or damage to and possible
shearing of the nut/bolt (over tightened). The sequences necessary to correctly carry out this work are as follows:- |
||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||
| Always
use the sequence 1, 2, 3, 4 (or north, south, east, west) - NOT clockwise
or anti- clockwise |
||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||